National Board of Medical Examiners
Projects (and how we got there from here)
RyFyAg = 1256 kips
Heavy Bracing
Stair Platforms over Existing Building
The "Missile Silo"
Topping Out
Fabricator:
Schlosser Steel, Inc
To see the drawings that produced the final product, click on the link below the picture
We designed all connections on this job.  Confusion reigned high as the job was
designed in ASD to the 2002 Seismic Provisions and the engineer attempted to tie all
requirements to the Ninth Edition of the Manual.